De-coupling soil-atmosphere interaction and the phreatic surface within tailings storage facilities on reclamation performance. FBC SupportSeptember 20, 2023
Closure planning and implementation at CVRD Inco’s Whistle Mine, Ontario, Canada FBC SupportSeptember 20, 2023
Measurement of moisture conditions for mine waste storage facilities using the Deep Diviner moisture probe adminSeptember 18, 2023
Incorporation of natural slope features into the design of final landforms for waste rock stockpiles adminSeptember 18, 2023
Hydraulic placement of a dry cover system – Design & performance monitoring (Kennecott Ridgeway Mine tailings dam cover system) adminSeptember 18, 2023
Choosing representative climate years for predicting long-term performance of mine waste cover systems adminSeptember 18, 2023
Cover and final landform design for the B-zone waste rock pile at Rabbit Lake Mine adminSeptember 18, 2023
Design and construction of the backfilled pit cover system at Whistle Mine, Canada: a case study adminSeptember 18, 2023
The use of “enhanced” moisture store and release cover system over reactive mine waste in arid and semi-arid climates adminSeptember 18, 2023